Monitoring and fault retention
Fault detection and latching are part of the design scope. A worked example explaining the chosen latch behaviour, reset conditions and alternatives will be added after the design is documented.
01 / Electric vehicles / Safety electronics
UCD Formula Student
Monitoring, fault detection and integration for the electrical systems of a Formula Student electric race car.
01 / CONTEXT
The Tractive System Active Light (TSAL) is part of the vehicle’s safety-related electronics. My work connects voltage and relay monitoring with digital fault logic, PCB development and wider vehicle integration. The work described here is ongoing; design release and completed validation are not claimed.
A useful status indication depends on more than a single signal. The design work considers tractive-system voltage, precharge relay monitoring and fault detection together, with attention to reliability and how the circuitry integrates with the rest of the car.
02 / CONTRIBUTION
03 / THE SYSTEM
Tractive-system voltage · precharge relay state
Fault detection · digital logic · latching
TSAL · vehicle motherboard interfaces
Functional summary of the work described, not a released schematic or a verified safety architecture. Signal polarity, thresholds and implementation details are intentionally omitted.
04 / IMPLEMENTATION
Digital logic gates and latching are being developed for fault detection. Logisim Evolution supports the circuit-level logic work.
LTspice is used for circuit analysis and simulation, and KiCad for schematic and PCB development. Physical work includes soldering, wiring and bench testing.
The motherboard brings TSAL, BSPD and support circuitry into a larger electrical system. My involvement includes working through this vehicle-level integration.
05 / ENGINEERING REASONING
Fault detection and latching are part of the design scope. A worked example explaining the chosen latch behaviour, reset conditions and alternatives will be added after the design is documented.
The logic model, circuit simulation and PCB layout address different parts of the problem. Final interface assumptions and evidence linking these stages remain to be published.
The central challenge is carrying monitoring and fault behaviour through logic, circuits and vehicle interfaces. A specific design iteration, its evidence and the lesson learned will be added here once documented.
06 / EVIDENCE
What is known, what remains to be demonstrated.
07 / WORK IN PROGRESS
Active design and integration work. The brief establishes hands-on involvement, but does not identify a completed PCB revision or a signed-off validation milestone.
08 / PROJECT NOTEBOOK
Space for the actual engineering: diagrams, hardware and evidence. Unfilled slots are labelled explicitly.
Approved schematic and logic diagram to be added.
Actual KiCad render and hardware photograph to be added.
Test setup, conditions and measured results to be added.
Public documentation links will be added when available and approved for sharing.